Jury Dates : 28-29 Nov 2014
Site Plan 1-250 with context
Basic Floor Plans (Basement, GF, FF, SF, Roof) 1-100
Sections 1-100
Elevations 1-100
Axonometric View
Model - Block Model 1-250, Detail Model 1-100 (Both are compulsory)
Wall Sections 1-20 or 1-25
Detail Model 1-25 or 1-50 (Optional but we encourage that you guys do it)
IMPORTANT NOTE:
A3 sheet explaining the approach and process of design (Feel free to present in form of diagrams,
sketches, photographs of model). This is extremely important – need to be submitted on 26th November
2014 by 3PM.
All above drawings need to be submitted on 26th November 2014 by 3PM
Models to be brought directly for the jury.
QUICK CHECKLIST
Drawings should be labeled properly. Name of spaces, sizes, levels, furniture, north symbol, scale of drawings, section lines, representation of humans, trees, existing road width, naming river or lake.
All Models should have human beings, trees
Focus on line weights, cut lines, elevation lines, roof lines and correct representation of build vs open.
Open to sky spaces and double height space should be represented with different line types.
Site Plan 1-250 with context
Basic Floor Plans (Basement, GF, FF, SF, Roof) 1-100
Sections 1-100
Elevations 1-100
Axonometric View
Model - Block Model 1-250, Detail Model 1-100 (Both are compulsory)
Wall Sections 1-20 or 1-25
Detail Model 1-25 or 1-50 (Optional but we encourage that you guys do it)
IMPORTANT NOTE:
A3 sheet explaining the approach and process of design (Feel free to present in form of diagrams,
sketches, photographs of model). This is extremely important – need to be submitted on 26th November
2014 by 3PM.
All above drawings need to be submitted on 26th November 2014 by 3PM
Models to be brought directly for the jury.
QUICK CHECKLIST
Drawings should be labeled properly. Name of spaces, sizes, levels, furniture, north symbol, scale of drawings, section lines, representation of humans, trees, existing road width, naming river or lake.
All Models should have human beings, trees
Focus on line weights, cut lines, elevation lines, roof lines and correct representation of build vs open.
Open to sky spaces and double height space should be represented with different line types.
No comments:
Post a Comment